by smith5280envengbuild2015 | Oct 2, 2019
PROJECT TEMPLATE Project Overview Originally build in the 1970’s, the former Westminster Mall was due to be demolished in preparation for the creation of a new mall at the Sheridan Boulevard-US 36 intersection. Due to risks of hazardous materials being present, SMITH...
by smith5280envengbuild2015 | Jun 4, 2018
Project Overview Originally build in the 1970’s, the former Westminster Mall was due to be demolished in preparation for the creation of a new mall at the Sheridan Boulevard-US 36 intersection. Due to risks of hazardous materials being present, SMITH provided a wide...
by smith5280envengbuild2015 | May 21, 2018
Project Overview The Southern Ute Indian Tribe (SUIT) needed assistance in addressing a wide range of hazardous materials management issues at abandoned buildings on the reservation. SMITH was awarded this on-call contract because of our experience providing similar...